Capture Schedule delayed and stops after few days

JhftJ

n3wb
Jan 20, 2024
2
0
Europe
I have few DS-2CD2512F-I set to capture a snapshot once a day. The Picture Capture/Capture Schedule is set to 12-13hr and the interval set to 1 hour (3600000 ms). It capture an image exactly 12:00:00 and saves it to the FTP server. This scenario works flawlessly for many years. Now I've bought a new DS-2CD2543G2-IWS, FW V5.7.23 build 260320. This model does it wrong. The settings are 100 % the same, but the snapshot is delayed by several minutes. The delays are following:

three days are capture on 12:05:51
next days are like 12:18:09
etc.

After few days it stops saving the snapshots at all! So I have to recheck and re-save the settings to make it saving again (still time-shifted). It saves about 3 days and then stops again. Why? Older cameras work fine same settings, same ftp server, same ftp account.